PDI Report › Sample report: new flat handover
Sample report: new flat handover
A complete example of the report you get after a new home handover inspection, with every snag and the full checklist.
This is a sample with example data, to show what you get. It is not a real customer's report.
Expert verdict
Accept after fixes
By an example civil engineer · sample
4issues
88OK
2not checked
Details
- Home
- Example 3-bedroom apartment
- Check
- New home handover (snagging)
- Where
- Bengaluru
- Area
- 1,450 sq ft as per agreement
Summary
The flat matches the plan and the papers are in order, but four snags need fixing before you take possession: hollow tiles, ceiling seepage from the flat above, the bathroom floor slope and a wall crack. Give the builder this list in writing with a date for each fix.
Issues to raise before you sign
Cracks in walls
IssueWalls and ceiling
Diagonal crack from the corner of the kitchen window, about 40 cm.

Damp patches, seepage or water stains
IssueWalls and ceiling
Damp patch and peeling paint on the bedroom 2 ceiling, below the bathroom of the flat above.

Hollow tiles (tap test)
IssueFloors and tiles
Six hollow floor tiles in the living room near the balcony door. Mark them for replacement.

Bathroom and balcony floors slope to the drain
IssueWaterproofing and drainage
Master bathroom floor slopes away from the drain; water pools in the corner.

Full checklist
Papers and approvals
Unit number, floor and area match the agreement
OKLayout matches the approved plan
OKOccupancy certificate (OC) seen
OKCompletion certificate matches the approved plan
OKRERA registration and carpet area match the agreement
OKProperty tax paid up to date
OKWarranties for fittings, appliances and waterproofing
OKSize and layout
Carpet area measured
OKRoom sizes match the brochure
OKCeiling height is the same in every room
OKBalcony and utility area as promised
OKWalls straight and corners square
OKWalls and ceiling
Cracks in walls
IssueCracks or sagging in the ceiling
OKBeams and columns: no cracks, no exposed steel
OKDamp patches, seepage or water stains
IssueWhite salt patches (efflorescence)
OKHollow plaster (tap test)
OKPlaster is smooth and even
OKPaint finish: patches, peeling, stains
OKFloors and tiles
Hollow tiles (tap test)
IssueCracked or chipped tiles
OKTile joints and grouting are even
OKTiles match in shade and pattern
OKFloor is level
OKSkirting is fixed and even
OKAnti-skid tiles in bathrooms and balcony
OKDoors and windows
Doors open, close and lock smoothly
OKMain door: lock, peephole, door closer
OKDoor frames: gaps, damage, termite signs
OKHandles, hinges and door stoppers
OKWindows slide, lock and seal
OKGlass has no cracks, and double glazing isn't fogged
OKMosquito mesh, if promised
OKGrills and railings are firm
OKWaterproofing and drainage
Bathroom and balcony floors slope to the drain
IssueNo damp below or beside bathrooms
OKBathroom step keeps water inside
OKFloor drains clear quickly
OKWindow and frame joints are sealed
OKBalcony and terrace waterproofing
OKTop floor: no stains from the terrace above
OKPlumbing
Water flow in every tap and shower
OKNo leaks under sinks or around fittings
OKTaps don't drip when closed
OKDrains empty fast, no gurgling or sewer smell
OKToilets flush, refill and are firmly fixed
OKConcealed cisterns and flush valves don't leak
OKHot water reaches every bathroom
OKWater heater: age, safety valve, earthing
OKFittings and sanitaryware are the promised brand
OKMain water shutoff valve is easy to reach
OKWater supply and storage tank
OKWater is clear with no smell
OKElectrical
Every switch, socket and fan regulator works
OKSockets are wired correctly
OKEarthing is correct
OKBreaker board is labelled and the RCCB or GFCI trips on test
OKLight, fan and AC points as per plan
OK15A points for AC and geyser
OKNo loose or exposed wiring
OKSanctioned load fits your AC and appliances
OKPower backup and inverter wiring, if promised
OKElectricity meter and connection
OKTV, internet and intercom points work
OKDoorbell and video door phone
OKKitchen and bathrooms
Kitchen counter: cracks, level, edge finish
OKSink, tap and drain
OKCabinets and drawers open and close properly
OKGas line and valve: no smell, leak test done
N/AKitchen exhaust and chimney points
OKBathroom exhaust fans work
OKMirrors, shower, health faucet and accessories are firm
OKBuilt-in appliances work: hob, oven, dishwasher
OKWardrobes and woodwork finish
OKCooling, heating and air
AC units cool and drain properly
OKRooms get fresh air with no stale or musty smell
OKRoof and outside
Outside walls: cracks and finish
OKSafety
Smoke alarms work (and CO alarms in the US)
OKFire extinguishers, sprinklers and fire exits
OKFire NOC issued for the building
OKStairs and handrails are safe
OKCommon areas
Lifts work and the licence is displayed
OKParking spot as allotted and usable
OKClubhouse, gym, pool and garden as promised
OKSewage and water treatment plants work
OKCCTV, intercom and security
OKEV charging point, if promised
N/ANo unfinished work in common areas
OKHandover
Keys, remotes and access cards handed over
OKMeter readings recorded: power, water, gas
OKEvery issue written down and signed by the builder
OKA date agreed to fix each issue
OKDefect liability period and repair contact
OKHow the report is laid out · How it works
Check it before you sign for it
Available in India and the USA. Booking is free; we confirm the fee before the visit.
Book your own check